VAC wants to build one more terminal in Tan Son Nhat Airport

Upgrade of Tan Son Nhat’s third terminal and other construction work have been mooted by the Airports Corporation of Vietnam (ACV) at the cost of VND11,400 billion ($490.1 million).

VAC wants to build one more terminal in Tan Son Nhat Airport

In its report of pre-feasibility of the third terminal project submitted to the Ministry of Transport, ACV analyzed the reality of the airport and need of new terminal construction.
According to the forecast, Tan Son Nhat Airport is expected to receive 45 million of passengers by 2025 whereas total capacity of two available terminal is able to receive 28 million a year. Therefore, ACV proposed the new well-equipped terminal in the area of 100,000 square meter will be designed to receive 20 million travellers a year.Additionally, ACV also put forward the plan to construct a runway, a two-lane path, a five-lane bridge and a parking lot. Total cost is estimated over VND11,430 billion ($490.1 million). ACV planned to call for public involvement in the project in the form of public-private partnership.Once being approved the project will begin in the third quarter of 2020 and expected to complete in the second quarter of 2022.Presently, the Ministry of Defense is transferring 16.7-hectare land to the Ministry of Transport for construction of the third terminal under the recently announced decision on adjusting the planning of the airport.

Source: Saigon on Line

Vietnam: three major airports need over 5 billion USD for upgrading

More than 5.11 billion USD is needed to build Long Thanh airport and upgrade Noi Bai and Tan Son Nhat airports for the 2018-2021 period, with a vision to 2025, according to the State-owned Airports Corporation of Vietnam (ACV) investment plan.

The number of passengers coming through 22 airports nationwide managed and operated by ACV is expected to grow 10 percent each year between 2018 and 2021 and is estimated to reach about 137 million by 2021.

Annual passenger growth rate between 2022 and 2025 is estimated to average 7 percent, hitting 185 million by 2025. Based on these numbers, ACV estimated investment on the three key airports.

During 2018-2021, Noi Bai International Airport in Hanoi will expand international terminal T2 to reach capacity of 15 million passengers per year and terminal T3 with capacity of 10 million passengers per year, while upgrading parking areas and supporting facilities. The upgrade looks to enable the airport to serve 30 million passengers across all terminals by 2020 and 60 million by 2030.

The total estimated investment for the upgrade is nearly 11.2 trillion VND (493.3 million USD).

Tan Son Nhat International Airport in HCM City needs over 12.6 trillion VND (555 million USD) to improve its capacity. Terminal T3 is planned to be constructed to serve 10 million passengers per year, along with an expansion of parking areas, runways and assisting equipment. The airport expects to welcome 45 million passengers per year by 2020.

Long Thanh Airport in the southern province of Dong Nai is in need of over 92.1 trillion (4 billion USD) for the first phase of its construction by 2025.

Source: Vietnam News Agency (VNA)